
The timeline question is the first thing most homeowners ask. I tell them: the real time saver is doing thorough design and selection work upfront. Rushing into demo without a locked plan is what causes delays.
Zach Freimark
Owner, Freimark Construction
Understanding the kitchen renovation schedule from start to finish helps you plan effectively, manage expectations, and enjoy a smoother process. This guide breaks down each phase so you know exactly what to expect.
Kitchen Remodel Timelines: Quick Answer
A full kitchen remodel in Boise typically takes 6 – 16 weeks from the start of construction, depending on the project’s scope. You should also factor in 2 – 6 weeks for design and planning, and another 1 – 3 weeks for material lead times before work begins. Minor cosmetic refreshes can be completed in just 2 – 4 weeks, while large-scale luxury or custom kitchens may extend to 16 – 24 weeks or more.
A common rule of thumb is to set aside a contingency of at least 20-30% of your total budget. This fund covers unforeseen problems, like discovering old plumbing that needs replacement or deciding on a minor upgrade. Failing to plan for these possibilities often leads to compromises on your vision or financial strain down the road. Understanding the typical costs for a kitchen remodel in the Boise area is the first step toward building a budget that is both ambitious and achievable.
Kitchen Remodel Timeline at a Glance
Every project is unique, but here is a general overview of the average time to remodel a kitchen based on the scope of work.
Minor Refresh
Painting, replacing a backsplash, swapping hardware, and upgrading light fixtures.
Mid-Range Remodel
New semi-custom cabinets, countertops, flooring, and appliances without major layout changes.
Major Renovation
A full gut-and-remodel that may include moving walls, relocating plumbing or electrical lines, and installing all new materials.
Luxury/Custom Kitchen
High-end custom cabinetry, specialty materials, complex structural changes, and meticulous artisan-level finishes.
Phase 1: Design and Planning (2–6 Weeks)
This is the most critical phase of the entire project. Proper planning here prevents costly delays and changes down the road. It’s where your vision takes shape and every detail is decided before a single hammer swings.
During this stage, we conduct an initial consultation to discuss your goals, style, and budget. Our team then develops detailed design concepts and 3D renderings to help you visualize the final space. You will work with us to make all your material selections, from cabinetry and countertops to flooring and fixtures. Once the design is finalized, we handle the permitting process. In Boise, permit processing typically takes 1-3 weeks, and having a complete plan ready is essential for a smooth submission. As Zach says, investing time upfront in a solid plan is the key to an on-time project. Want a deeper look at how to approach this stage? Check out our guide on how to design your dream kitchen from concept to reality in Boise.
Phase 2: Pre-Construction Prep (1–3 Weeks)
Once the design is locked and the contract is signed, we move into the pre-construction phase. This is where the logistical magic happens behind the scenes. Our team places orders for all your selected materials, including cabinets, appliances, countertops, and tile.
This phase is highly dependent on material lead times. For example, custom cabinet lead times can be anywhere from 6-12 weeks. Countertop fabrication begins after your cabinets are installed, with the process from template to installation taking another 2-4 weeks. We coordinate all these timelines to ensure materials arrive before they are needed for installation. During this time, we will also schedule demolition and help you prepare by setting up a temporary kitchen area to minimize disruption to your daily life.
Phase 3: Demolition and Rough-In (1–2 Weeks)
This is when the physical transformation begins. Our crew will carefully demolish and remove all the old elements of your kitchen, from cabinets and countertops to flooring and fixtures. We take great care to protect the rest of your home with dust barriers and floor coverings.
Immediately following demolition, we start the “rough-in” work. This involves making any necessary structural changes, such as moving or removing walls. Our licensed plumbers and electricians will then run new pipes and wires for your new layout, ensuring everything is up to code for sinks, dishwashers, lighting, and appliances. This foundational work is crucial for the success of the installation phase.
Phase 4: Installation (3–8 Weeks)
With the groundwork laid, your new kitchen begins to come to life. This is often the longest phase of a [kitchen remodel], as it requires precision and careful sequencing. The order of installation is critical to achieving a high-quality finish.
Typically, the process follows this order:
Flooring and Drywall
The new subfloor is installed, followed by hanging and finishing drywall.
Cabinet Installation
Your new cabinets are professionally installed and secured.
Countertop Templating and Fabrication
Once cabinets are in, we create a precise template for your countertops.
Countertop Installation
The finished countertops are installed.
Appliance and Fixture Installation
The sink, faucet, dishwasher, oven, and other appliances are put in place.
Backsplash and Flooring
The backsplash tile is installed, and the final flooring surface is laid down.
Phase 5: Finishing and Final Walkthrough (1–2 Weeks)
The final phase is all about the details that make your kitchen shine. This includes painting walls and trim, installing cabinet hardware, putting in light fixtures, and completing any remaining trim work.
Once our work is complete, we conduct a final inspection with you. Together, we will create a “punch list” of any minor items that need adjustment. At Freimark Construction, our commitment to quality assurance means we address these items immediately to ensure your complete satisfaction. After the final touch-ups are done and the space is professionally cleaned, your beautiful new kitchen is ready for you to enjoy.
What Can Delay a Kitchen Remodel?
Even with the best planning, unexpected issues can arise. Understanding these potential roadblocks can help you prepare.
Permit Delays
Navigating city approvals can sometimes take longer than expected.
Material Backorders
Supply chain issues can delay the arrival of custom or specialty items.
Scope Changes
Adding or changing elements mid-project will almost always extend the timeline and increase the kitchen remodel cost.
Structural Surprises
Discovering hidden plumbing, electrical, or structural issues after demolition can require extra time to resolve correctly.
A great contractor anticipates these risks. At Freimark Construction, our proven process includes building strong relationships with suppliers, submitting thorough permit applications, and conducting detailed site assessments to minimize surprises.
Tips to Keep Your Kitchen Remodel on Schedule
For a complete overview of the process, our step-by-step home remodel checklist is a great companion resource as you plan your project. You play a key role in ensuring your project stays on track. Here are three tips for a smooth and timely kitchen renovation:
TIP 1
Finalize All Selections Before Construction Starts
Make every decision about materials, fixtures, and colors during the design phase. This allows your contractor to order everything ahead of time and prevent decision-fatigue delays.
TIP 2
Budget for Contingencies
Set aside 10–15% of your total budget for unexpected issues. This ensures that if a problem arises, it can be addressed quickly without derailing the project schedule or your finances.
TIP 3
Trust the Process
Once construction begins, try to avoid making changes. While it may seem small, altering a design element mid-project can have a ripple effect on the schedule and budget. Trust the plan you and your contractor created together.

Kitchen Remodel Timeline FAQs
Most reputable contractors in the Boise area are booked 4–12 weeks in advance, especially during the busy spring and summer seasons. Starting the design and planning phase early ensures you can secure your preferred construction window.
Yes, most homeowners stay in their homes during a kitchen renovation. However, you should expect limited kitchen access for several weeks. Many families set up a temporary kitchen with a microwave, coffee maker, and refrigerator in another room.
Cabinet installation and countertop fabrication often take the longest. Custom cabinetry can require 6–12 weeks of manufacturing, and countertops must be templated after cabinets are installed before fabrication begins.
Yes. Projects involving electrical, plumbing, or structural work require permits from the City of Boise or Ada County. Permit review typically adds 1–3 weeks to the planning phase before construction begins.
The most common cause of delays is changes after construction begins. Altering materials, layout, or design decisions mid-project can disrupt installation sequencing and require additional ordering or inspections.
Ready to Start Planning?
A well-planned kitchen remodel is an investment in your home’s value and your daily enjoyment. While the timeline can seem complex, working with an experienced contractor who prioritizes communication and detailed scheduling makes all the difference.
If you are ready to start planning your Boise kitchen remodel, contact Freimark Construction today. We can provide a personalized timeline and a detailed estimate to help you turn your vision into a reality.
















