Whole Home Remodel in Boise, Idaho
One contract, one crew, and a plan for the whole house, from layout to finishes.
A whole-home remodel planned as one project
A whole home remodel in Boise means several rooms or the whole interior under one scope, one contract, and one crew: the layout, the systems behind the walls, and the finishes in every room, planned together and built in a sequence you approve. We design and build whole-home remodels across the Treasure Valley as one Treasure Valley remodeling company, from the first consultation through the final walkthrough, with the scope and the cost fixed before construction starts.
One plan beats room-by-room work because the decisions overlap. Removing the wall between the kitchen and the living room changes the flooring run, the lighting plan, the ductwork, and the electrical panel load, and a remodel that settles those once, on paper, costs less and finishes sooner than three separate projects that reopen the same walls. One scope also carries the finishes through the house, so every room reads as one home.
It starts with a design consultation at your home, where we walk the house, talk through what is not working, and set the scope the estimate is built on.

What we build

Full interior remodel
A full interior remodel takes the house down to the framing where the plan calls for it and rebuilds it: a new layout, new electrical, plumbing, and HVAC, new insulation and drywall, and new finishes in every room. Older homes get their systems brought to code while the walls are open. The Light & Oak House is one of ours.

Open-concept conversion
Opening the kitchen to the living room usually means removing a load-bearing wall, and that is structural work: an engineer sizes the beam, the city reviews the drawings, and the crew sets shoring before the wall comes out. We handle the engineering and the permit, and plan the flooring, lighting, and ductwork so the open room reads as one space.

Phased whole-home remodel while you live there
When moving out is not an option, we split the house into phases and finish one zone before opening the next: bedrooms and one bathroom first, then the kitchen with a temporary kitchen set up elsewhere, then the living spaces. Dust walls separate the work zone from the rooms you use, and the total runs longer than a vacant-house remodel.

Kitchen, bath, and addition packages
Most whole-home scopes include a kitchen remodel with an open layout, new storage, and premium finishes, one or more bathroom remodels with custom tile work and fixtures, and often a home addition, a bump-out or a second story that blends with the existing architecture. Planned as one project, they share one design, one permit package, and one schedule.
Get Your Free Estimate
Tell us about the project. We will follow up to set up an in-home consultation.
(208) 810-0874What a whole-home remodel costs in Boise in 2026
A whole-home remodel in the Boise area typically runs from $250,000 to $1,000,000 or more, depending on the scope, the structural changes, and the finishes.
Four things move the number most: square footage, because every finish and system is priced by the area it covers; structural changes, because a removed load-bearing wall adds engineering, a beam, and city review; the kitchen and bath count, because those rooms carry the costliest cabinetry, tile, and plumbing; and the finish level, because the gap between builder-grade and premium flooring or countertops adds up across a whole house.
The scope is set before the number: the design is complete, every selection is made, and the engineering is done, and the estimate is written against that package. The number does not move once it is set, and a contingency line inside it covers what an older home can hide behind its walls. What a remodel budget covers walks through each part.

How long a whole-home remodel takes
Most whole-home remodels in the Boise area run 6 to 12 months from the first design meeting to the final walkthrough, and design and permitting come first, before any demolition starts.
Design and planning
Site walk, measured drawings, floor plan, structural engineering, every material selection, the fixed estimate
Permitting and procurement
Plans submitted to the city, plan review and corrections; windows, cabinets, and long-lead appliances ordered
Demolition and structural work
Interior stripped where the plan calls for it, walls removed or framed, beams set, foundation or structural repairs made
Rough-ins
New wiring, plumbing lines, and HVAC ductwork run through the open walls and ceilings; rough inspections
Insulation and drywall
Insulation inspected and installed; drywall hung, taped, mudded, and textured
Interior finishes and fixtures
Flooring, cabinets, countertops, tile, paint, and trim, then light fixtures, plumbing fixtures, appliances, and hardware
Final walkthrough and punch list
Walk the whole house together, list every item that needs adjusting, finish the list, final inspection
The design phase is where the schedule is won. Every layout decision, every material, and every fixture is settled before demolition, so the crew builds from a complete plan and nothing waits on a choice. We treat the permitting weeks as working time: selections are locked, and windows, custom cabinets, and long-lead appliances are ordered, so the build starts the day the permit is issued.
Construction runs in the order the inspections require. Demolition and structural work open the house, the rough-ins go in while the walls are open, insulation and drywall close them, and the finishes follow in the order that protects the work already done: flooring and cabinets before countertops, tile and paint before fixtures. Each phase passes its inspection before the next one covers it.
Four things add weeks to a whole-home schedule, and the plan accounts for each. City plan review backs up in peak building season, which is why the permitting phase has a range. Rot, pest damage, or wiring that is not to code behind the walls of an older home gets found during demolition and fixed before the rough-ins start. Custom materials have long lead times, so they are ordered during permitting. And a mid-build design change re-sequences every trade behind it, which is why the design is finished first.

Permits and inspections for a Boise whole-home remodel
Nearly every whole-home remodel in Boise needs permits, and most pull four: a building permit for structural changes such as removing walls, altering the roofline, or adding a foundation; an electrical permit for new wiring, moved outlets, or a panel upgrade; a plumbing permit for relocated fixtures and new water or drain lines; and a mechanical permit for HVAC work, including a new furnace or new ductwork. Inside the city limits the applications go to City of Boise Planning and Development Services; properties outside the city fall under Ada County Development Services.
Homes in other cities and counties go to that jurisdiction's building department. We file every application, answer the city's correction requests, and schedule each inspection, so you never deal with the permit office yourself.

Plan review for a whole-home remodel runs 4 to 8 weeks from submission to approval, and a package that includes structural engineering drawings, such as a load-bearing wall removal, gets additional review. Those weeks are not idle: the long-lead materials are ordered while the city reviews the plans, so the crew starts the day the permit is issued.
A permit does two things for you. The inspections confirm that the structural, electrical, plumbing, and mechanical work meets code while it can still be seen, and the record stays with the house, so when you sell, the work is documented as reviewed and approved.
The inspections are checkpoints built into the construction schedule, not a single visit at the end:
Each inspection passes before the next phase closes the work in. We build the full sequence into the project schedule from day one, meet the inspector on site, and keep the phases moving, so no wall is closed before the inspector has seen what is inside it and the crew is never waiting on a sign-off.
Inspections
- Rough framing inspection, after the walls are framed and before insulation or drywall
- Rough electrical, plumbing, and HVAC inspection, before the walls close
- Insulation inspection, before the drywall goes up
- Final inspection, confirming the completed work matches the approved permit
Planning your whole-home remodel
Remodel or rebuild
Remodeling the house you have is usually the better call when the foundation and the framing are sound, when the home sits where current zoning would no longer allow it, or when its character is worth keeping. A teardown and rebuild makes sense when the foundation is failing or when the layout you want cannot be reached inside the existing structure. The comparison below is how we walk through it at the first meeting.
| Factor | Whole-home remodel | Teardown and rebuild |
|---|---|---|
| Cost | Usually lower; approaches rebuild cost only when extensive structural problems turn up | Higher up front: demolition, debris removal, and all-new construction |
| Timeline | Often faster; open to delays from conditions found in the existing structure | More predictable once construction starts, longer overall because a new structure needs more design and permitting |
| Foundation and structure | Works within the existing footprint and foundation; major flaws are expensive to fix | A new foundation and structure, engineered from scratch; the answer when the current foundation is failing |
| Zoning and setbacks | Existing placement is often grandfathered in, even where new construction would not be allowed there | Must meet every current zoning rule, which can mean a smaller or repositioned house on the lot |
| Customization | Layout changes are possible, inside the limits of the existing structure | Complete freedom, including ceiling heights and window placement |
| Historic character | Keeps the character of an older home while its systems are modernized | The original character is lost; not an option for a designated historic property |
Living at home or moving out
Decide this before the design is final, because it changes the schedule and the phasing. Moving out is the faster and cleaner route: the whole house is open at once, and the crew works every zone in sequence. Staying means we phase the work, keep one bathroom running, set up a temporary kitchen in a bedroom or the basement before demolition starts, and agree on a daily communication window so nothing on site surprises you.
Changes during construction
Finish the design completely before demolition starts, every layout decision, every material, and every fixture, and then hold to it. A change mid-build ripples through the schedule: materials already ordered may not be returnable, subcontractors reschedule, and the work gets re-sequenced. One kitchen layout change can push the cabinet delivery back by weeks and hold every trade that follows. We set a selection deadline in the agreement so the build runs with no open decisions.
The home's architecture
A good whole-home remodel respects the home's original character while modernizing its systems and finishes. The Boise area ranges from craftsman and Tudor homes to mid-century ranches, and the details that make each one feel right, the built-ins, the trim profiles, and the proportions of the rooms, are worth keeping. We design the new layout and the finishes so the finished house feels like it was always this way rather than a modern interior dropped into an older shell.
Who manages the project
On a whole-home remodel one person coordinates every trade, schedules every inspection, takes every delivery, and makes the daily calls on site. At Freimark that is one project manager, on your job from demolition to the final walkthrough, with one schedule for every trade. Before you sign any contract, settle who is on site each day, how decisions get made when you are not there, and how a change is priced and approved. Our step-by-step remodel checklist covers what to settle before you start.
How a Freimark whole-home remodel works
Every whole-home remodel runs through the same four-step process we use on every project.

Design Consultation
We meet at your home to walk the house, talk through how you live in it and what is not working, and set the budget, so the plan for the whole house starts from your priorities rather than a template.
3D Renderings
You review the floor plans, the material selections, and 3D renderings of the new layout before construction begins, so every room is approved on screen, and the estimate is written against that approved design.
Expert Construction
Our crew builds the approved plan room by room, in the sequence the schedule sets, with one project manager handling the subcontractors, the inspections, and the deliveries, and sending you regular progress updates.
Final Walkthrough
Before we call the project complete, we walk the whole renovated house with you and review every room against the approved design. Anything that needs adjusting goes on the punch list and is finished before we close out.

Why homeowners choose Freimark for whole-home remodels
Four things set a Freimark whole-home remodel apart, each settled before demolition starts.
Pre-construction planning with a fixed scope
The design, the engineering, and every selection are complete before the estimate is written, so you know the scope, the schedule, and the budget before construction starts, and the number does not move.
Permits, plan review, and inspections handled
We prepare the permit package, carry it through City of Boise plan review, and schedule and attend every inspection, from rough framing to the final.
One crew and one point of contact
The team that designs your remodel is the team that builds it, and Zach Freimark, President, manages the whole project, so every question gets one answer.
Selections and schedule in writing
Finishes, fixtures, and the phase-by-phase schedule go into the written agreement before demolition, and you see the schedule and the budget as they stand throughout the build, so there is nothing to argue about mid-project.
Whole-home remodel FAQs
What factors influence the total cost of a whole-house remodel in Boise?
Home size, scope of work, layout changes, and material selections set the total. Older Boise homes may need electrical, plumbing, or structural upgrades that add cost, and permits, design services, and specialty trades affect the price as well. The cost table above gives the range per square foot for each scope, and the estimate is written against a complete design, so every one of those factors is priced before you sign.
What hidden costs should I expect in a whole-home remodel in Boise?
Plan for outdated wiring or plumbing, structural repairs uncovered during demolition, and code-required upgrades, which are the costs that most often sit behind the walls of an older home. Permit revisions, utility improvements, and material price changes can add to the total as well. A contingency line in the budget covers these without stopping the work, and the site walk during design is where we look for them first.
What are the key phases and typical durations of a full home remodel project?
A full home remodel runs through design and planning, permitting, demolition, construction, and final finishes, and most take 6 to 12 months in total. Design and permitting take the first several months, before any demolition, and construction fills the rest, depending on the scope and the structural work involved. The phase table above lists each stage and its typical length.
Can homeowners stay in their house during renovations?
Yes, on many projects, when the work is phased so one bathroom and a temporary kitchen stay in use. Whole-home remodels involve utility shutdowns, limited access to parts of the house, and dust and noise, so many homeowners choose to move out for the heaviest phases, which is also the faster route to a finished house. We settle this during design so the schedule is built around it.
How do Boise homeowners finance a whole-home renovation?
Most whole-home remodels are financed through a home equity loan, a home equity line of credit, or a cash-out refinance, and larger gut renovations sometimes use a construction-to-permanent loan. Which one fits depends on your equity and how you want to draw the funds. Settle the financing during the design phase so it is in place before the estimate is signed and construction starts.
What is the difference between a remodel and a renovation?
A remodel changes the form or layout of a space, such as moving walls or reconfiguring a kitchen, while a renovation restores what is there to a new condition, such as new paint, flooring, and fixtures. The terms are often used interchangeably, and a whole-home remodel usually includes both: the layout changes where the plan calls for it, and every room is renovated to match.
Before you build
What a remodel budget covers beyond materials and labor
the costs a low estimate leaves out and how a remodeler prices them.
Read →Step-by-step checklist for your home remodel
the decisions to settle before, during, and after the build.
Read →Home remodeling trends in Boise
the layouts, materials, and upgrades homeowners are asking for.
Read →Budget-friendly remodeling tips
where to spend and where to hold back.
Read →
Start your whole-home remodel
Ready to plan the whole house as one project? Tell us about the home, and we will set up a consultation.