
Kitchen Remodel in Boise, Idaho
Custom kitchens for Treasure Valley homes, with layout, cabinets, and cost settled before demo day.
A kitchen remodel planned before the first wall comes down
A Freimark kitchen remodel in Boise is a full-service job: we design the layout, help you select the cabinets, countertops, flooring, backsplash, lighting, fixtures, and appliances, and build it, as one Treasure Valley remodeling company from the first meeting through the final walkthrough. Some homeowners come to us with a finished design and need it built as drawn. Others arrive with a few photos and a list of what frustrates them about the kitchen they have. Either way, it starts with a consultation at your home, a design that fits the house and the budget, and a written scope with the schedule and the cost fixed before demolition.
This page answers the three questions every kitchen remodel starts with: what it costs in the Boise area, how long the kitchen is out of service, and which parts of the work need a permit. It also covers the decisions worth settling early, from work zones to cabinet grade, so the number you sign does not move once the walls are open.

What we build

Full kitchen remodel with a new layout
The wall comes down, the sink moves to the island, and the kitchen gets the floor plan the house should have had. We handle the structural work, re-route the plumbing, gas, and electrical, and rebuild the room from the subfloor up with new cabinets, countertops, flooring, and lighting. The Warm Modern Farmhouse Kitchen shows the finished result.

Cabinet, countertop, and lighting refresh in the existing footprint
When the layout already works, the remodel keeps the sink, range, and refrigerator where they are and replaces what you touch and see every day: cabinets, countertops, backsplash, lighting, fixtures, flooring, and paint. Keeping the plumbing and gas in place keeps this scope at the lower end of the cost range and, in most cases, off the permit desk.

Kitchen expansion or bump-out
A kitchen with the right layout and the wrong size gets bigger. A bump-out pushes an exterior wall out for a larger island or a pantry; a full home addition adds a new room off the kitchen. Both involve a foundation, a roofline tie-in, and a permit, so we build them and the kitchen as one project.

Open-concept kitchen as part of a whole-home remodel
When the kitchen is one piece of a larger plan, the dining room wall, the great room, and the kitchen are designed together so the sight lines, flooring, and lighting match across the house. We run it as a whole-home remodel under one scope and one schedule, with the kitchen sequenced so the house stays livable.
Get Your Free Estimate
Tell us about the project. We will follow up to set up an in-home consultation.
(208) 810-0874What a kitchen remodel costs in Boise in 2026
Most kitchen remodels we build in the Boise area run from $75,000 to $100,000. Cabinet grade, countertop material, and layout decide where in that range your kitchen lands.
Five things move the number most:
Cabinet grade
Cabinetry is the largest single line in most kitchen budgets. Stock costs the least, semi-custom adds sizes and finishes, and custom is built to the inch with the longest lead time.
Countertop material
Quartz, granite, marble, and quartzite sit at different price points, and slab size, edge profile, and seams change the fabrication cost.
Layout changes that move plumbing or gas
Keeping the sink, dishwasher, and range where they are is the least expensive layout. Moving any of them means new supply, drain, and gas lines, a permit, and often an engineer.
Appliances
The appliance package is a budget line of its own, and built-in units need cabinetry sized around them, so it is chosen before the cabinets are drawn.
Permits and design
Drawings, engineering where a wall moves, and permit fees are a small share of the total, in the estimate from the start.
Get a fixed number for your project
We measure the space at your home and settle the scope and the cost before construction starts.
The full breakdown, with the budget split across cabinets, labor, countertops, and appliances, is in our kitchen remodel cost guide for Boise.

How long a kitchen remodel takes
Construction on a standard kitchen remodel runs 6 to 12 weeks, and the design, selections, and ordering before it run another 4 to 12 weeks. The kitchen is out of service only for the construction weeks, because demolition does not start until everything is on site.
Design consultation and layout
Goals, measurements, the floor plan, initial design
Material selection
Cabinets, countertops, flooring, tile, fixtures, lighting, and appliances chosen and priced
Ordering and lead times
Everything delivered before demolition; custom cabinets alone can take 8 to 12 weeks
Demolition and rough-ins
Dust protection up, old kitchen out, walls framed, new plumbing, gas, and electrical run, rough-in inspection
Drywall, paint, and flooring
Drywall hung and textured, first coat of paint, floors installed
Cabinets and countertops
Cabinets set and leveled, countertops templated, fabricated, and installed
Backsplash, fixtures, and appliances
Tile, sink and faucet, lighting and outlets, appliances set, final inspection
Punch list and walkthrough
Final paint, hardware, cleanup, walkthrough
We do not start demolition until every major component has been delivered and inspected, because a kitchen sitting gutted while a backordered cabinet panel ships is the delay homeowners feel most. Three other things stretch a schedule: appliance lead times, so appliances are ordered with the cabinets; change orders after demolition, which can mean re-ordering material; and a rough-in that does not pass its first inspection and has to be re-inspected before drywall goes up. The phase-by-phase detail is in our kitchen remodel timeline post.

Kitchen remodel permits in Boise
A kitchen remodel needs a building permit when it moves or adds a wall, relocates the sink, dishwasher, or range, adds or moves electrical circuits or lighting, or runs a new gas line. Like-for-like work does not: new countertops on the existing cabinets, paint, a new faucet in the same spot, or new flooring. Most full remodels fall on the permit side, and a refresh in the existing footprint often does not.
The permit puts an inspector's sign-off on the wiring, plumbing, and framing before drywall covers it, and it records the work in your home's history, which matters when the house sells or an insurer asks.

We handle all of it. We prepare the drawings, submit the application to the city or county your home sits in, build the plan review time into the schedule, and meet the inspector on site twice: the rough-in inspection after framing and new lines are in, and the final inspection once the fixtures are installed. You never deal with the building department yourself. Which projects need a permit and what the application involves is covered in our kitchen permit post.
Planning your kitchen

Work zones instead of the triangle
Plan the kitchen around how you use it, not one triangle between the sink, range, and refrigerator. A prep zone beside the sink, a cooking zone with pans at the range, a baking zone with the mixer stored low, a coffee station out of the cook's path, and a landing spot for groceries each get their own counter and storage.
Stock, semi-custom, and custom cabinets
Stock cabinets come in fixed sizes and arrive fastest, semi-custom start from a catalog with changes to size and finish, and custom are built to your drawings. The grade sets the budget and the lead time, so we settle it first. Drawers, pull-outs, and a tall pantry do more for storage than extra uppers; our cabinet layout tips show how.
Countertop materials
Quartz is non-porous, needs no sealing, and comes in consistent colors, the low-maintenance choice for a busy kitchen. Granite is nearly as durable, with a one-of-a-kind pattern, and needs sealing about once a year. Marble gives the classic veining and etches more easily, so it suits a baking station over a range wall. Our quartz vs granite comparison goes deeper.
Lighting and electrical capacity
Good kitchen lighting is three layers: ceiling fixtures for general light, under-cabinet and pendant light over the work zones, and accent light. The electrical plan comes with it: a remodel is the time to add dedicated appliance circuits and counter outlets and to confirm the panel has the capacity, all permitted and inspected while the walls are open.
How a Freimark kitchen remodel works
Every kitchen runs through the same four-step process we use on every remodel, built to keep the project on track from the first meeting to the last walkthrough.

Design consultation
We meet at your home, measure the kitchen, and talk through how you use it, what is not working, and what you want to spend. You leave the meeting knowing which scope fits the house and the budget.
Design and estimate
We draw the layout, walk you through the cabinet, countertop, flooring, and lighting selections, and price every line. The scope, the schedule, and the cost go into a written agreement before anything is ordered.
Construction
Demolition starts once every major component is on site. Our crew runs the trades in sequence, schedules each inspection, keeps the dust contained, and sends regular progress updates so you always know where things stand.
Final walkthrough
Before we call the job complete, we walk the finished kitchen with you, test every drawer, door, fixture, and appliance, and handle anything that needs adjusting. The kitchen is done when it works the way the plan said it would.
Recent kitchen projects

Why homeowners choose Freimark for kitchens
Four things set a Freimark kitchen apart, each settled before the crew shows up.
Pre-construction planning with a fixed scope
Every kitchen starts with planning detailed enough that the scope, the schedule, and the budget are set before demolition, and our estimating and scheduling software shows you progress and costs throughout.
Permits, plan review, and inspections handled
We prepare the application, carry it through plan review, and schedule and attend the rough-in and final inspections, so no phase waits on a sign-off.
One crew and one point of contact
The team that designs your kitchen is the team that builds it, and Zach Freimark, President, whose experience spans the trades, manages every remodel we build and answers your questions himself.
Selections and schedule in writing
Cabinets, countertops, fixtures, appliances, and the phase-by-phase schedule go into the written agreement before the first wall comes down, so the number holds and every detail is built as drawn.
Kitchen Remodel FAQs
How much does a kitchen remodel cost in Boise?
Most kitchen remodels we build in the Boise area run from $75,000 to $100,000. Cabinet grade, countertop material, the appliance package, and whether the layout moves plumbing or gas decide where your kitchen lands in that range.
How long does a kitchen remodel take?
Construction runs 6 to 12 weeks for a standard kitchen remodel, after 4 to 12 weeks of design, selections, and ordering. We do not start demolition until every major component has arrived, so the kitchen is out of service only for the construction weeks. Custom cabinets and appliance lead times are the two things most likely to add time.
Do I need a permit for a kitchen remodel in Boise?
Yes, if the remodel moves or adds a wall, relocates the sink, dishwasher, or range, adds electrical circuits or lighting, or runs a new gas line. Like-for-like updates such as new countertops on the existing cabinets, paint, flooring, or a faucet in the same spot usually do not need one. We prepare and file the permit and schedule every inspection as part of the project.
Can we live at home during the remodel?
Yes, for most projects. We seal off the kitchen and put up dust protection so the rest of the house stays livable, but you will not have a working kitchen for the length of construction. Set up a temporary kitchen in another room with a microwave, a coffee maker, and a small refrigerator, and plan the start date around any week you need the house quiet.
What is the difference between semi-custom and custom cabinets?
Semi-custom cabinets are built from a standard catalog of sizes and styles, with changes allowed to dimensions and finishes. Custom cabinets are built from scratch to your drawings, so they fit an odd wall to the inch and can include any feature you want. The trade-off is price and lead time: custom costs more and takes longer to build, so the decision gets made early in design.
What does a Freimark kitchen remodel include?
Design, the floor plan, cabinetry, countertops, flooring, backsplash, sinks and fixtures, appliances, lighting, tiling, painting, plumbing and electrical, and built-in storage, all under one scope and one schedule. We handle the permit and the inspections, run every trade in sequence, and walk the finished kitchen with you before we call it done. If you arrive with a completed design, we build it as drawn; if you need help choosing materials, that is part of the job.
Before you build
What a kitchen remodel costs in Boise, line by line
the budget split by cabinets, labor, countertops, and appliances, and how to plan a contingency.
Read →Kitchen remodel timelines, phase by phase
every construction phase and what makes a schedule slip.
Read →Do you need a permit for a kitchen remodel in Boise?
what the city permits, what it does not, and how the application works.
Read →How to choose a kitchen remodel contractor
the questions to ask and how to compare bids.
Read →Kitchen remodel decisions that set the budget
the eight choices that decide whether the project stays on budget.
Read →Get a fixed number for your project
We measure the space at your home and settle the scope and the cost before construction starts.

Ready to Start Your Boise Kitchen Remodel?
Reach out to Freimark Construction today to get started on your Boise kitchen remodel. The estimate is free, with no obligation.



